CRIP: program pressures to ease safety requirements - examples are pressures for KSC landings, pressures to reduce EOM WX ceilings & constraints, pressures to relax TAL WX requirements or use 109% to bridge gap.

DOCUMENTS TO ASK FOR:

1. ALL DOCUMENTS RELATING TO THE SRB TESTING & CERTIFICATION PROGRAM: THE ORIGINAL TEST & CERT PLANS, & THE RESULTS of the TESTS; ANY INTERNAL MSFC MEMOS RELATING TO SRB TEST & CERT; THIOKOL MEMOS & DOCUMENTS RELATING TO TEST PGM. (THESE SHOULD INCLUDE DISCUSSIONS of TESTS & ANALYSES USED TO CERTIFY TO NASA REQUIREMENTS

2. ANY MSFC INTERNAL MEMOS & THIOKOL INTERNAL MEMOS RELATING TO JOINT CERTIFICATION OR PERFORMANCE AT LOW TEMP

3. ALL INFORMATION AVAILABLE PRE-51L ON EXISTENCE (INSTANCES) or LIKLIHOOD of H20 IN THE JOINTS