• agreed to launch no comm to PS's if req'd

• Autoland is bad idea

• range safety system: ① need agreement for 2 eng out case ② tank heating on a TAL

• egress: ① side hatch not viable on a crash ② overhead egress not viable (tokenism)

• Centaur (Hk writing a memo w/flt dir)

• 41D eng shutdown incident:  no accident board was convened after the H[[subscript]]2[[/subscript]] fire (e.g. … no protection was added to the access arm)

• Langley did a study on SRB thrust termination

• GWSA's inputs are filtered ~ launch time

• check reports from "AEROSPACE ADVISORY
PANEL" (Annual reports. '85: John Brizendine,  6306 Bixby Ave, Long Beach 90815)