21 MAR (Wash DC - open hearing)
• spare parts → enough info
• reconstruction (failure analysis)
• R SRB recovery estimated complete in 2-3 wks

[[strikethrough]]✓[[/strikethrough]]Call A[[superscript]]2[[/superscript]] (working group reports)

Dan Germany
• .8 → 2.25 sec ⇒ puffs of smoke (at ~ 3 Hz...maybe). Smoke is varying shade of gray (not white, then black)
• 270°→ 315° (around 300°), ±1 ft of jnt
• photo team will make some recommendations in its report
• "flashes" @ ~ 45 sec probably not peculiar to 51L (assoc w/SSME plume)

Dr Littles (MSFC)
• ET failure due to structural flaw → eliminated