Viewing page 4 of 138

[[left margin note]] 
15 RTF
(29)
[[/leftmargin]]

MSG: ∙Complex Systems Fail In Complex Ways
∙Seemingly Small Problems Can Re [[strikethrough]] Create [[/strikethrough]] Catastrophic Circumstances

=> Have to be vigilant
=> Anything can get you 

Physical & Organizational Causes
-> Rely on Past Success
-> Been told this before

TBA
responsible for all test
reg. & waivers
identify/analyze control hazards
trend & rush analysis
FEMA
integrated hazard analysis


ck 8
∙CONFLICTING GOALS of COST, SCHED, SAFETY
∙BLOCKED EFFECTIVE COMM. 

[[right margin]]
replace shuttle as soon as possible as primary means

RTF 
TPS (FOAM, RCC)
Repair/Inspection
Imaging or Launch/orbit
Bolt catchers
Closeouts
FOD 

Schedule
MMT  TNG
ORG:
Detailed plan is RTF
{① TEA
{② Office of safety
dir. line
authority over
SSP safety org.
⇒indep funded
{③ Investigation Office 

Close out photos & digitize 
[[/right margin]]

Transcription Notes:
TBA - can mean 'to be announced' or 'to be added' - got from a website with NASA acronym list. SCHED - schedule RTF - Return to Flight checks are listed TPS is Test Preparation Sheet which makes sense. RCC -one of main types of thermal materials is Reinforced Carbon- Carbon. FOD - Foreign Objest Debris STD - Office of the STD is the Shuttle Test Director - good guess? MMT - Mass Memory Test TNG - ? SSP - Space Station Program

Please note that the language and terminology used in this collection reflects the context and culture of the time of its creation, and may include culturally sensitive information. As an historical document, its contents may be at odds with contemporary views and terminology. The information within this collection does not reflect the views of the Smithsonian Institution, but is available in its original form to facilitate research. For questions or comments regarding sensitive content, access, and use related to this collection, please contact transcribe@si.edu.