Viewing page 4 of 138

This transcription has been completed. Contact us with corrections.

[[left margin note]] 
15 RTF
(29)
[[/leftmargin]]

MSG: ∙Complex Systems Fail In Complex Ways
∙Seemingly Small Problems Can Re [[strikethrough]] Create [[/strikethrough]] Catastrophic Circumstances

=> Have to be vigilant
=> Anything can get you 

Physical & Organizational Causes
-> Rely on Past Success
-> Been told this before

TBA
responsible for all test
reg. & waivers
identify/analyze control hazards
trend & rush analysis
FEMA
integrated hazard analysis


ck 8
∙CONFLICTING GOALS of COST, SCHED, SAFETY
∙BLOCKED EFFECTIVE COMM. 

[[right margin]]
replace shuttle as soon as possible as primary means

RTF 
TPS (FOAM, RCC)
Repair/Inspection
Imaging or Launch/orbit
Bolt catchers
Closeouts
FOD 

Schedule
MMT  TNG
ORG:
Detailed plan is RTF
{① TEA
{② Office of safety
dir. line
authority over
SSP safety org.
⇒indep funded
{③ Investigation Office 

Close out photos & digitize 
[[/right margin]]

Transcription Notes:
TBA - can mean 'to be announced' or 'to be added' - got from a website with NASA acronym list. SCHED - schedule RTF - Return to Flight checks are listed TPS is Test Preparation Sheet which makes sense. RCC -one of main types of thermal materials is Reinforced Carbon- Carbon. FOD - Foreign Objest Debris STD - Office of the STD is the Shuttle Test Director - good guess? MMT - Mass Memory Test TNG - ? SSP - Space Station Program