This transcription has been completed. Contact us with corrections.
STS - Info 1. Flt rate post-Columbia; current support facilities (KSC, ect); current production plan (SRB et) 3. Relaxed flt rate option • Current manifest fly-out (3 orbiters, facilities, etc) • Implications on [[of?]] 2010 budget (any savings?) on 2011 budget [[right margin]] • Implications for current contracts • Pros/cons for workforce, facilities 2. Current Plan → Contingency budget in fy [[?]] 2011? (or impact on other pgms) Implication if not flown (on ISS) (e.g. 3 FtTs [[?]] Short...) Background on AMS (Scientific justification- nas? [[?]] Useful scientific life? Workforce Issues 4. Moderate extension (Thru 2012) (a)• Brief congressionally mandated study of any updates on new thinking • Safety/risk implications, cost, etc • Pros/cons for ISS • Pros/cons for constsluation [[?]] • Pros/cons for workforce & facilities (b) Minimal option [Minimizing add'l flts, facilities, etc] e.g. 1 extra flt, or 2 5. Extension Thru 2015 — Congressional study — Retain Capability (minimal)
Transcription Notes:
I listed some stuff as being in a right margin, but it's not technically. It seems like she went back and added those two bullet points later, so should it be transcribed as though it wasn't?