This transcription has been completed. Contact us with corrections.
Date 7/11 TECH FINDINGS: FEASIBLE, SOME STRUC. IMPROVEMENTS, PULL OVER ARES 1 AVIONICS ↑ in PRODUCTION RATE ACHIEVABLE GROUND PROCESSING/LAUNCH OK (NO ISSUES in [[Δ?]]) COSTS: ALL ~ or BETTER (LIFECYCLE THRU 14 LEO FLTS) TIME: (w/ 1 yr DESIGN CYCLE RESYNC) ~ 5.5 → 7 yrs LONG POLE = GND FACILITIES [[left margin]] DEBRA EMMONS [[/left margin]] CX - INDEP ASSESS: COST/SCHED/TECH ASSESS/RISK [ORION? SIZE?] [COMPARED TO EELV COSTS] 3.5 - 4 yr risk + 10C TO 10C $16.8 B cost IMPACT OVER $35.9B RMRO9] [[right margin]]65% CONF LEVEL [[/right margin]] WITH ALL DELAY CAUSES INCL, NO HUMAN LUNAR RTN w/IN 2035 [[left margin]] MATT [[/left margin]] ISS LIFE EXTENSION STUDY CRITICAL HW + SPARE PARTS PROVISIONING ISS (PARTNERS, AGREEMENTS, RECERT, RISKS) (Science) COSTS, ISSUE MMOD analysis? [[right margin]] NOTE = SOME RUSSIAN Sci SEG SCHED for end of '11 [[/right margin]] [[right margin]] ① HR 1) IV H against "new" CX [[/right margin]] ② HUMAN-RATED ATLAS V? FIT SMALLER ORION ON EXISTING? TO BO [[left margin]] (ATLAS V ? (ORION SIZE? (MORE from MATT (ISS) [[/left margin]] ③ [[drawing of star]] COTS reliance [ISS] 7/17 [[strikethrough]] 4 [[/strikethrough]]
Transcription Notes:
[[Δ]]? - don't know what else it would be.
Delta -in this case, it may refer to the rate of change, such as in a derivative.