This transcription has been completed. Contact us with corrections.
Ed √ Sand chart - [[??]] (Flexible = 4A) in-space refueling? √ New runs √ send old runs • Sidemount/Shuttle carrying costs [[note]] 2 Remaining Runs (4B, 4C, 2) Sensitivity Runs 4B Constrained to $1.5B + &4 [[crossed out]]C [[crossed out]] • Ramp to +105B by 2012 Then 2.4% √ 4C: SAME CONDITIONS AS BEFORE √ 4B: (1) SAME CONDITIONS ($11b c.c.) (2) STOP & RESTART ORION RESTART : 2015 √ 2: FY10 BUDGET SIDEMOUNT $3B for COMM CREW ZERO-BOIL-OFF FLEXIBLE (SAME INPUT MANIFEST for THAT AS 4C)