Viewing page 56 of 61

This transcription has been completed. Contact us with corrections.

Ed
 √ Sand chart - [[??]] (Flexible = 4A)
    in-space refueling?

 √ New runs

 √ send old runs
 • Sidemount/Shuttle carrying costs

                 [[note]] 2
Remaining Runs   (4B, 4C, 2)
  Sensitivity Runs

4B   Constrained to $1.5B +
&4 [[crossed out]]C [[crossed out]]

             • Ramp to +105B by 2012
                  Then 2.4%

         √ 4C: SAME CONDITIONS AS BEFORE
         √ 4B: (1) SAME CONDITIONS ($11b c.c.)
               (2) STOP & RESTART ORION
                          RESTART : 2015

         √ 2:  FY10 BUDGET
               SIDEMOUNT
                 $3B for COMM CREW
                 ZERO-BOIL-OFF
                 FLEXIBLE (SAME INPUT MANIFEST for
                             THAT AS 4C)