This transcription has been completed. Contact us with corrections.
KidSat Preliminary Design Review DOCUMENTATION REQUIREMENTS 5/23/95 NASA/JSC Functional Requirements Document (FRD): In development Payload Integration Plan (PIP): Final draft to be signed at PDR Need JSC's assistance with streamlined inputs to PIP Annexes Use existing JSC payload documentation for flight hardware Verification, safety, crew procedures, integration & test JPL/SESPD Experiment Implementation Plan (EIP): In development KIDSAT USER DOCUMENTATION Hardware/Sofrware User's Guide (JPL/UCSD) Mission Planning / Mission Operations Guide (UCSD) Exploration Plan(s) (JPL) Curriculum Module Notebook (JHU) Teacher Training (JHU/JPL) Instrument Design Guide (JPL-Future development) KidSat- 6