Viewing page 9 of 77

This transcription has been completed. Contact us with corrections.

KidSat Preliminary Design Review
DOCUMENTATION REQUIREMENTS
5/23/95

NASA/JSC
Functional Requirements Document (FRD): In development
Payload Integration Plan (PIP): Final draft to be signed at PDR
Need JSC's assistance with streamlined inputs to PIP Annexes
Use existing JSC payload documentation for flight hardware
Verification, safety, crew procedures, integration & test
JPL/SESPD
Experiment Implementation Plan (EIP): In development
KIDSAT USER DOCUMENTATION
Hardware/Sofrware User's Guide (JPL/UCSD)
Mission Planning / Mission Operations Guide (UCSD)
Exploration Plan(s) (JPL)
Curriculum Module Notebook (JHU)
Teacher Training (JHU/JPL)
Instrument Design Guide (JPL-Future development)

KidSat- 6