![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
UCSD Before Mission Schools (A) UCSD MISSION CONTROL GATEWAY (B) [[image]] Schools (A) | UCSD Mission Control Gateway Before Mission | Start | Start A1.1 Receive preliminary info. Prepare preliminary mission sketches/wish lists, incl. overall study plan. | AB1.1 | AB1.1 B1.1 Relay preliminary info, solicit preliminary mission sketches/wish lists from schools. BC1.1 AB1.2 | AB1.2 BC1.2 A1.2 Receive detailed mission data and orbit segment assignments. AB1.3 | AB1.3 | Assign orbit segments to schools. Notify schools of their segments. BC1.2 A1.3 Prepare School Mission Plan: Design experiments. Determine images desired. Compile plan Documents req'd: Mission Planning Guide Software Users Guide.| AB1.4|AB1.4 B1.3 Check and verify school mission plans. Provide feedback. Publicize plans of all schools. AB1.5 A1.4 Evaluate feedback from MCG AB1.5| B1.4 Collect and sort mission plans from all schools. A1.5 Changes needed? yup| B1.5 Prepare MCG mission plan. Inform JSC, JPL.| BE1.1 BC1.3 Nope A1.6 Prepare for mission A1| B1.6 Evaluate feedback from JSC, JPL.| BC1.4 BE1.2 B1.7 Changes needed? yup| nope B1 [[left margin]] May-24-95 11.55 FROM: SECTION 389 ID:8183066929 PAGE 7/32 D. Schilling 5/12/95 File: Mission Scenario v1 Page 1