Viewing page 18 of 77

This transcription has been completed. Contact us with corrections.

UCSD
Before Mission
Schools (A)
UCSD MISSION CONTROL GATEWAY (B)
[[image]]
Schools (A) | UCSD Mission Control Gateway
Before Mission | Start | Start
A1.1 Receive preliminary info. Prepare preliminary mission sketches/wish lists, incl. overall study plan. | AB1.1 | AB1.1 B1.1 Relay preliminary info, solicit preliminary mission sketches/wish lists from schools.
BC1.1
AB1.2 | AB1.2
BC1.2
A1.2 Receive detailed mission data and orbit segment assignments.  AB1.3 | AB1.3 | Assign orbit segments to schools. Notify schools of their segments. BC1.2
A1.3 Prepare School Mission Plan: Design experiments. Determine images desired. Compile plan Documents req'd: Mission Planning Guide Software Users Guide.| AB1.4|AB1.4 B1.3 Check and verify school mission plans. Provide feedback. Publicize plans of all schools. AB1.5
A1.4 Evaluate feedback from MCG AB1.5| B1.4 Collect and sort mission plans from all schools.
A1.5 Changes needed? yup|  B1.5 Prepare MCG mission plan. Inform JSC, JPL.| BE1.1 BC1.3
Nope A1.6 Prepare for mission A1| B1.6 Evaluate feedback from JSC, JPL.| BC1.4 BE1.2
B1.7 Changes needed? yup| nope B1
[[left margin]]
May-24-95 11.55 FROM: SECTION 389 ID:8183066929 PAGE 7/32
 
D. Schilling 5/12/95
File: Mission Scenario v1
Page 1