PRELIMINARY 

INTEGRATION AND TEST PLAN

INTEGRATION TEST PLAN

• Software will be integrated at SMOC sites
Sept., 1995
• Characterize joint activities involving SMOCs
• Test schedules
• List of all required participants 

TESTING

• Begin tests summer with selected students (Jr. & Sr. High)
• Develop and test workstations at CalSpace
• Then move to school sites
• SMOC supported system level testing
• Students work with KidSat to evaluate, change and update systems
• Continues, as needed

TRAINING

• Summer training at UCSD
• Trained on Mission Operations, Software, Background technology.....,

Proposed Training Topics
• Tour of facilities
• Introduction to background technology
• Utilization of software packages
• Training of Mission Operation procedures
• WWW instruction
• Mission Simulation

Sept., 1995 to March, 1996
• Training continues at UCSD
• On-site training implemented
• Concurrent with the Integration and Test Plan

Post-flight Debriefing
• Teachers / Students to fill out evaluation / questionnaire
• Modify systems accordingly

H.H. Haugen 23 May, 1995
Page 32/32