![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
PRELIMINARY INTEGRATION AND TEST PLAN INTEGRATION TEST PLAN • Software will be integrated at SMOC sites Sept., 1995 • Characterize joint activities involving SMOCs • Test schedules • List of all required participants TESTING • Begin tests summer with selected students (Jr. & Sr. High) • Develop and test workstations at CalSpace • Then move to school sites • SMOC supported system level testing • Students work with KidSat to evaluate, change and update systems • Continues, as needed TRAINING • Summer training at UCSD • Trained on Mission Operations, Software, Background technology....., Proposed Training Topics • Tour of facilities • Introduction to background technology • Utilization of software packages • Training of Mission Operation procedures • WWW instruction • Mission Simulation Sept., 1995 to March, 1996 • Training continues at UCSD • On-site training implemented • Concurrent with the Integration and Test Plan Post-flight Debriefing • Teachers / Students to fill out evaluation / questionnaire • Modify systems accordingly H.H. Haugen 23 May, 1995 Page 32/32 ID: 8183066929 MAY-24-95 12:01 FROM: SECTION 389