Viewing page 12 of 47

This transcription has been completed. Contact us with corrections.

Agenda

EXPRESS Pallet
Ground Demonstration Baseline Design Review
July 20, 1995

Presentation                         Presenter                  Time

I. Introduction                     Lowell Primm             8:30 to 8:45
II. Requirements                    Lowell Primm             8:45 to 9:15
III. Objectives                     Jim Schaffer             9:15 to 9:45

Break                                                        9:45 to 10:00
                                                             
IV. Systems                         Brad McCall              10:00 to 10:30
V. Mechanical                       Jim Charles              10:30 to 11:30

Lunch                                                        11:30 to 12:30

VI. Electrical Power System         Brad McCall              12:30 to 12:50
VII. Data System                    Brad McCall              12:50 to 1:20
VIII. Software                      Vance Davis              1:20 to 2:00

Break                                                        2:00 to 2:15

IX. Operations                                               2:15 to 2:30
X. KSC Integration and Operations   C. Nguyen                2:30 to 3:00
XI. Document Tree                   Jim Scheib               3:00 to 3:15
XII. Payload Candidates             Lowell Primm             3:15 to 3:30
XIII. Thermal                       Darin Boyer              3:30 to 3:45
XIV. Ground Demo. vs Flight         Jim Schaffer             3:45 to 4:15
XV. Summary                         Lowell Primm             4:15 to 4:30
-Recommended Actions
-Next Meeting
XVL. Adjourn                                                 4:30

I-2