f. A VTR cassette with TBD #6 hours of recording capacity. (KidSat unique) 
g. TBD #6 PGSC 350 or 500 MB hard disks. (KidSat unique)

7.2 Customer-provided Hardware

The following hardware will be provided by the customer. TBD #7

8.0 FLIGHT OPERATIONS

This section defines the flight design, flight activity planning, flight crew and flight controller training, and flight operations support activities required for SSP/payload integration.

8.2 Flight Activity Planning- Requirements will be provided to MOD and reflected in the Flight Data File (FDF)
8.3 Training- Requirements will be provided to MOD and reflected in the master Crew Training Plan. 
8.4 Flight Operations Control- Requirements will be provided to MOD and reflected in the Flight Data File (FDF)
8.5 Inflight Maintenance- Requirements will be provided to MOD and reflected in the Flight Data File (FDF)
8.6 Ground Data Interfaces- TBD #8

9.0 LAUNCH AND LANDING SITE OVERVIEW

The payload will be received at KSC as a JSC repacked middeck locker. Installation and removal from the Orbiter are the only L&L requirements.

9.1 Customer Processing- Not applicable.
9.2 Payload Integration- Not applicable.
9.3 Orbiter Integration- No unique requirements
9.4 Postlanding

The payload will be removed from the Orbiter during normal destow operations, and returned to JSC for return to the customer.