f. A VTR cassette with TBD #6 hours of recording capacity. (KidSat unique) g. TBD #6 PGSC 350 or 500 MB hard disks. (KidSat unique) 7.2 Customer-provided Hardware The following hardware will be provided by the customer. TBD #7 8.0 FLIGHT OPERATIONS This section defines the flight design, flight activity planning, flight crew and flight controller training, and flight operations support activities required for SSP/payload integration. 8.2 Flight Activity Planning- Requirements will be provided to MOD and reflected in the Flight Data File (FDF) 8.3 Training- Requirements will be provided to MOD and reflected in the master Crew Training Plan. 8.4 Flight Operations Control- Requirements will be provided to MOD and reflected in the Flight Data File (FDF) 8.5 Inflight Maintenance- Requirements will be provided to MOD and reflected in the Flight Data File (FDF) 8.6 Ground Data Interfaces- TBD #8 9.0 LAUNCH AND LANDING SITE OVERVIEW The payload will be received at KSC as a JSC repacked middeck locker. Installation and removal from the Orbiter are the only L&L requirements. 9.1 Customer Processing- Not applicable. 9.2 Payload Integration- Not applicable. 9.3 Orbiter Integration- No unique requirements 9.4 Postlanding The payload will be removed from the Orbiter during normal destow operations, and returned to JSC for return to the customer.