SSP/JSC/MT/CUSTOMER & FLIGHT INTEGRATION OFFICE

                          KIDSAT

PROPOSED PIP
PIM: S. CASTLE  PAYLOAD INTEGRATION SCHEDULE  PIP NO.: NSTS 21332

[[8 COLUMN TABLE]]
|          |PREVIOUS    |1995                           |1996|
|MILESTONES|OR COMPLETED|JAN FEB MAR|APR MAY JUN| JUL AUG SEP|OCT NOV DEC|                                        |JAN FEB MAR| APR|

PIP ANNEXES         | |             |SUB 16 DRAFT 29 |
ANNEX 6 CREW COMP   | |                                |SIGN 10 B/L |
                    | |   |                               22 |
ANNEX 7 TRAINING    | |             |SUB 16          |
                    | |             |SUB 16          |
ANNEX 9 VERIFICATION| |             |DRAFT  16  B/L 1|
____________________________________________
ENGINEERING         | |   |               |

LOADS ANALYSIS      | |             |DES RPT  16    |
LOADS VERIFICATION  | |   |                                   RPT 13  |
THERMAL ANALYSIS    | |             |DES RPT  16    |
                    | |             |MODEL  16      |
THERMAL VERIFICATION| |                                |    RPT 15     |
EMC TEST DATA       | |                                             |       SUB 21  |
___________________________________________
HARDWARE DELIVERY   | |   |               |  
CUSTOMER HDWR       | |                                             |    Sub 5           |             

MODEL ID: 20-21 JUL93   SSP   P/L   JOINT    SCHEDULE AS OF: 19-MAY-95 8.19 am.   LOCAL REPORT ID: PRPC