Viewing page 36 of 109

This transcription has been completed. Contact us with corrections.

Mission operations--preliminary schedule

Fall 1994 

• Establish design teams:
-- mission control design team
-- gateway design team
-- mission ops centers design team
• Begin design process
• Begin discussions with
-- Morris H. S.
-- Gompers

Winter 1995

• Refurbish Labs
• Design / prototype MCC
• Design / prototype interface with JSC
• (4-6 199 students; Space Science class)