![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
Mission operations--preliminary schedule Fall 1994 • Establish design teams: -- mission control design team -- gateway design team -- mission ops centers design team • Begin design process • Begin discussions with -- Morris H. S. -- Gompers Winter 1995 • Refurbish Labs • Design / prototype MCC • Design / prototype interface with JSC • (4-6 199 students; Space Science class)