Viewing page 20 of 29

This transcription has been completed. Contact us with corrections.

Table of Contents
---

[[3 columns]]
Contact Information | [[blank]] | 1
1.0 | Abstract | 1
2.0 | Test Objectives | 2
3.0 | Test Description | 2
4.0 | Equipment Description | 4
5.0 | Structural Load Analysis | 4
6.0 | Electrical Load Analysis | 5
7.0 | Pressure Vessel Certification | 5
8.0 | In-Flight Test Procedures | 5
9.0 | Parabola Requirements, Number and Sequencing | 6
10.0 | Test Support Requirements, Ground and Flight | 6
11.0 | Data Acquisition System | 6
12.0 | Test Operating Limits or Restrictions | 6
13.0 | Proposed Manifest for Each Flight | 6
14.0 | Photographic Requirements | 7
15.0 | Hazard Analysis | 7
16.0 | Safety Certification | 9
17.0 | Outreach Plan | 9