Viewing page 63 of 82

This transcription has been completed. Contact us with corrections.

②
[[boxed]] ON-ORBIT [[/boxed]] - SB-1: systems check; PLBD
[[boxed]] ORANGE [[/boxed]] - OMS burn & D/O
re-enter - MACH 25; T ≤ 2700°F
injection => radio blackout
[[boxed]] LANDING [[/boxed]] - [no engines]
RCS + aerosur/acro (PHASED IN > MACH 1)
19° angle (final) → 1 1/2 ° TD ~ 200 KNOTS
[[boxed]] LAUNCH [[/boxed]] - STS-2: COLOMBIA = 1ST  into space twice
STS 1 - 4: test flts (crew of 2 w/ejection seats)
STS-5 => "operational" (PL'S took precedence, ∴ needed bigger crew
[[boxed]] STS-7 CREW [[/boxed]] (5 career astro)
[[boxed]] PAM-D [[/boxed]]
[[boxed]] CHARLIE [[/boxed]]
[[boxed]] MMU [[[/boxed]]
[[boxed]] SOLAR MAX [[/boxed]]
[[boxed]] STRUCTURES [[/boxed]]
[[boxed]] EARTH OBS [[/boxed]] - {KSC CAPE COD _ 24 shuttle flts (4 shuttle COL. = 7 DIS = 6 ATL = 2 CHALLENGER = 9+1
[[boxed]] BLACK SMOKE [[/boxed]]
2 yrs 25TH flight - 73 SEC > launch
leak right away - pulled out…after max q: burn thru → no indications nothing crew could have don [[DONE]]
[[boxed]] ROGER'S COMM [[/boxed]] - load design "unacceptably secretive & a # of factors"
e.g. 8 OF 25 had similar prob w/o-ring
REC: redesign / safety / management / maintenance / landing / esc.
[[boxed]] STS-26 CREW [[/boxed]]
[[boxed]] TDRSS [[/boxed]]
[[boxed]] LAUNCH [[/boxed]] ← manifest 
CHANGE GEARS
(home movies)
13TH: OCT 84 ERBS
SIR-B
7 people
ORS