Viewing page 44 of 62

This transcription has been completed. Contact us with corrections.

84

2. each DIP should be limited to one industry + one desa
3. good that these projects give attention to penghijauan problem
4. will these be a problem in supply of solar? how will a continuous supply be assured (see above p.5)
5. often assumed how quality a function of low skills - may, however, be a function of market demand
6. where is wood for [[?]] from ? (see abpve 17 +10) - will there be a supply problem here- are the [[?]] makers in Kampang [[?]] making rough village [[?]] on cawed typed w/ [[?]] designs

PR 16:
project to help 4 industries located in Kec. Batumarmar (= marble), Kab. Pamekasan
a. project to aid 5 stone quarry units in [[Lesa?]] Kapong employing total of 25 - 40 workers ((one page says 25, one says 40)) - quarrying something called "batu qunung" - elsewhere says that stones used for kapur (chalk) and roads and hence removal aids agriculture - would indicate a limestone

85

b. project to aid 15 units producing terasi and petis (shrimp paste and fish sauce) in villages of [[Strikethrough]] Kampo [[/Strikethrough]] Kapong and Batubintang
are 15 units (being aided but apparently 50 units employing 100 workers in entire [[?]] - not consistent because says 15 units being aided employ 50 people ((would indicate helping only larger units)) - uses [[?]] raw materials small fish or fish / shrimp which not sold (= unsaleable)
c. project to aid 5 units producing blacked lime and employing 25 persons in desa Balutrintang - is apparently all the units there - produce something called "Kapur Tohor" ((tohor = dried))
d. project to aid 10 units  [[?]] bamboo employing 30 [[pengrajin?]] (later page says 50) in desa Blaban - make variety of projects and use bamboo from the area - hence don't cut down penghijauan trees

general notes that pop. of kec. growing