Viewing page 18 of 43

This transcription has been completed. Contact us with corrections.

d. kodok besar (pres)

buys clay 1 are 300,000

has 30 are, 1 1/2 - 2 are dibitasi dalamnya - below a diff type of soil

buys paras as campuran, buys 
also  per are, Pas
550,000  13 are

[[drawing]]

baleh sampai habis
[[strikethrough]] laheet [[strikethrough]] wherever clay he trys a truckload 1st before buying
clay from 2 banjan
a. Pardak 1 tonir
b. Kedungu 1 tonir

paras from banjas Beji, 
Jisa Pejaten 1 toni

tried pasir but pecar2 
(sekem [[??]] kasan)

450 watt 
6 eylindes diesel w/ mollen - if remove 6 bolts can

tempat usaha dikontrak, 15 are selama 5 tahun - will move after 5 yrs.

21,6355,000 investment (mesin mollen, tempat pembakaran, tempat kekerja, tempat penjemuran

rombong = kiln

parents died 1961-63 + he + 2 brothers worked all kinds of jobs, selling peanuts, toys, kernet

tenaga kerja habis 2-5 juta dep. on season

also makes batako from pasin + cement - needs a mesin for