batako (3 juta) - now makes

1 sombong milik sendisi; 5000 kodok + plentong
model S 12000
klungkung 10,000

in dry rents 2 others + in rainy sometimes rents 1 other

1. 1 juta habis to make a rombong from bricks, besi balton, kayu sesek 
- includes shed

[[two column table]]
|omset genteng terang per day| naing|
|1.5: 5500 X 30 | 2000 X 37 1/2|
|2. klungkung 6500 X 40 | 3200 X 47 1/2|
|3. plentong 1250 X 80 | 750 X 85|
|4. kodok 1250 X 85 | 700 X 90|
|5. batako 350 X 160 | same|

omset toko material + klongtong
700,000-800,000 of which 10% profit

- istri jaga toko

[[strikethrough]] tenaga [[strikethrough]]

clay 500,000 per are 
= 200 cubic
2 1/2 get 1000 tiles per cubic (plentong)
0.83 on 3000 S
1 1/4 on 2000 [[strikethrough]] klungkung [[strikethrough]] kl
2 1/2 on 1000 kodok

paras costs 1 1/2 Rp per [[biji?]] genteng
kodok or plentong

.7 kl
.5 s

Toko Adi S

1 bakafan pakai minyak kodok
sofar 1 Rp per bijr

[[right margin]] for mollen [[right margin]]
S 0.3 
kl 0.45

oli .5 kl + kodok
0.1 S
0.25 kl