if present project 2 trucks a day he pays per rate (actually every 2 weeks or mo, but calculations based on rate) 27,000 a truck for batu = 3 cubic 600 cubic = 200 rate for pasif 4 cubic per rate, 35,000 a truck [[strikethrough]] if o [[/strikethrough]] walls of stones & pasir calculations based on finished wall 600 cubic stones also makes about 600 cubic of wall 1 cubic batu needs 0.60 cubic pasir & semen 4 sak