Bill of Material for the Erection of a School House in the City of Lynchburg 50 x 25 ft. 2 Stories high. and to be lathed and plastered, and 12.000 Heart pine Shingles at 5 00 per thousand. 

The following Material for Framing is to cost $22 50 per Thousand.

4 Sills 26ft Long 8 x 8
2 Sills 25ft Long 8 x 8
76 Joist 25ft Long 2 x 12 
37 C Joist 28ft Long 2 x 10
112 Studs 20ft Long 2 x 4
18 Posts 20ft Long 4 x 4
52 Rafters 18ft Long 3 x 5
26 C Braces 14ft Long 3 x 5
Sheeting 2000ft: Bill for
Framing 18.230 ft - 22.50 per M

Plastering the Entire House = $190:00

The following Material to cost: the following prices:
4500. ft Weatherboards @ 25 00
4500 ft 1¼ flooring @ $35.00
      { 3000 ft 1 in, dry clear Stuff @ 25.00
6000 { 1500 ft 1¾ for door & windows frames @ 25 00
      { 500 ft for Steps & Hand Rails 1½ $25 00
      { 1000 ft 1½ for Sash and doors 25.00
12 Kegs nails 5.25
1 Doz pr door Hinges & Screws @ 50.
5 Box Glass @ 6 00
6 Locks @ 1 00
11 Perchs Stone, underpinning @ 1.25
4000 Brick Chimney @ 11 00