Mr. Jerry Wender
A. J. & W. Construction Comp.
Brooklyn, New York.

August 23 1952.

Dear Jerry,

As of today, the following things remain to be done on the premises of 94 Kings Point Road, Great Neck Long Island :

1. Electric outlets in two bedrooms in two bedrooms inoperative,also the hall bathroom. Check out all switches. [[Basement?]] [[lights?]] (5) over on Living room switch
2. Leak in left hand sink in Master Bath Room.

3. Diswasher leaks. ALSO INSTALL SHUT OFF VALVE OK

4. Flashing around waste vent line in roof leaks. 

5. Toilet bow[[strikethrough]]els[[/strikethrough]]ls in both bath rooms loose and wobbly. Both bowls require two more bolts each to secure the front ends and also should be cemented in place. The fastening bolts should also be secured and made watertight.

[[left margin]] Hall Bath drain sluggish & [[/left margin]]

6. Make permanent repairs to " washout"in driveway. ✓

7. Replace broken knobs on mirror in master bathroom. OK

8. Install missing knobs on kitchen cabinet. OK

9. Clean out waste trap area in basment [[basement]] and cover same. OK

10. Clean out garage, remove encrusted cement. 🗸

11. Fit all radiator covers securly [[securely]] and in place. OK

12. Clean fireplace brick, remove all stains.  by Gitt


As far as I know, that is all that remains to be done in order to complete the home for delivery. Should you know of any other work that should be done will you take care of that also.

Thankyou for your courtesy and cooperation, I am,

Sincerely yours,
Michael A. Gitt
Michael A. Gitt