Viewing page 50 of 63

This transcription has been completed. Contact us with corrections.

                                                                         4
Note: all holes bored in channels subsequent to [[strikethrough]] so [[/strikethrough]] galvanizing or furring members with exposed rustable parts due to cutting etc, shall be painted at the edges with undiluted asphalt paint.
                                                                  
Leveling  Wire lath shall be applied tight, flat and well streched. Furring [[strikethrough]] and [[/strikethrough]] lathing etc shall be thoroughly levelled, plumb and rigid, leaving all surfaces in proper condition to receive the plaster.
Note No deviation from a plane surface shall be allowed to [[strikethrough]] sho [[/strikethrough]] stand.