-2-
4. Fade memorandum into option being signed. (Ruhl to arrange for filming of land sale.)
5. Surveyors in field. Field maps.
6. Drafting room. Architects at work.
7. Models and modelmaking.
8. Architects studying material samples.
9. Shift to Washington relief problem showing groups of relief works anxious for jobs,-flash to drafting tables with hand of draughtsman and pen,-to mechanical erasing machine on drafting table,-to blue-printing machine,-to hurrying messenger,=to line of unemployed,-to final signing of drawings by project planners,-to work train taking on workers,-to signatures of Coordinator and Chief Planner,-to unloading of men at Branchville,-to signature of Director,-fade from rectangle of title and signatures into house excavation of similar outline and proportion.
10. Foreman with blue-print on excavation,-focuse close-up of print and fade to group of engineers at engineering headquarters all of whom have prints.
11. Change to Resident Engineer's desk with Bills of Lading. Focus on word Lumber, cement, and fade to lumber or cement truck being unloaded at warehouse.
12. Warehouse with materials.
Bathtubs, pipes, etc.
13. Focus on large feet, muddy boots, rise from boots to wheels, sunk in mud, to tractor treads, to boots again, to worried faces in Engineer's office as of frame 10. Chief Engineer points to location on map for Experimental Houses.