Viewing page 9 of 22

This transcription has been completed. Contact us with corrections.

Total Cost with 10% added

[[strikethrough]]Rec'd 129B 129C Parker Heber[[/strikethrough]]

TRANSPORTATION BUILDING - Isaac S. Taylor.
Rec'd 129a 16 seated figures 289.25 1600-Geo. J. Zolnay finished 3600 5200 4
Rec'd 130 48 figures in crown pylons 342.69 200 Geo. J. Zolnay F. Horter finished 1760  1960 1
Rec'd 131 16 seated figures on base of columns 315.88 600 W. Sievers finished 2800  3400 1
Rec'd 132 6 groups ox figures with shield in arches850-P.Wiehle MIDWAY made in St Louis finished 2400  3250 3
Rec'd 147 Cowboys 500 Fred. Remington 1000 finished 1500 8
Rec'd 129b G. Packers 1 seated figure finished            17
Rec'd 129c C. Heber 1 seated figure finished