Total Cost with 10% added

MINES & METALLURGY BUILDING. Theo. C. Link.

[[8 columned table]]
|---|---|---|---|---|---|---|---|
| Rec'd | 88 | Frieze | 1000-Theo. Baur finished | 2100 | 3100 | 4 |   |
| Rec'd | 79 | 4 Statues 1219.67 | 1200-F.W.Ruckstuhl finished | 1800 | 3000 | 4 | 4 |
| Rec'd| 93 | Small section of frieze Humphries | 600-R.Schwarz finished | 1000 | 1600 | 3 | 1 |
| Rec'd | 94 | Center figure 16 Torchbearers 1 figure | 400-R.Schwarz finished |  4800 | 5200 | 2 |   |
| Rec'd | 95 | [[strikethrough]] 32 Figures Group 1 Flanking torch bearers [[\strikethrough]] | 1600-R.Schwarz finished | 3000 | 4600 | [[overwritten]] 2 [[\overwritten | 3 | 4 |
[[strikethrough]] |   | 96 | Frieze around obelisk | 700-R.Schwarz | 2000 | 2700 | [[strikethrough]] 3 [[\strikethrough]]|   | [[\strikethrough]]
| Rec'd all| 97 | 14 pairs of figures above frieze line | 100-Chas. J. Mulligan finished | 4000 | 5000 | 2  |   |
|   |   |   |   |   |   | 18 | 4 |   