15

7 Dec 81

Title_________________________
Project No. _________
Book No. ____________

From Page No. ____   KSC Status - cont'd

[[underlined]]OMS/RCS[[/underlined]]
RCN to do lockup checks, pre/sec reg checks
Now estimate 6 shifts - possible shed hut

[[underlined]]SRB[[/underlined]] 
re-works cplt; stacking to resume. Rdy mate 12/21

[[underlined]]ET[[/underlined]] 
all systems test today
Mods in work; TPS on shed 
Ready rate 12/15
Both [[underlined]]EMU's[[/underlined]] now shipped.
 
[[underlined]]RMS[[/underlined]]
B/U drive prob due overcropped wire in D & C
(DAC camera pnl inst'n followed RMS test/close out)
Fixed & retested 
V1175 finished Sunday
T/S PDRS camera probs says trouble in cameras. P/T in ELB was a camera prob - camera replced. 

[[underlined]]Pwr dn biggies[[/underlined]]: APU 1 R/R
Cryo 4 instl'n (LH2/LO2 purge 1st)
FC 1 install
Smoke detector self-test: Passed on 3rd try. 
2 CRT's replaced: S/N 24 & 23.
[[image]]
Theodolite 1400
Hawley - Zero- G Flight? KC-135 [[down arrow]] til 4/82

To Page No._____

Witnessed & Understood by me, ____________________
Date _________
Invented by ____________________
Recorded by ____________________
Date ____________