This transcription has been completed. Contact us with corrections.
Project No.__ TITLE___ Book No.__ [[56 Column Table - See Notes]] | Hours | | 0 | | | 1 | | | 2 | | | 3 | | | 4 | | | 5 | | | 6 | | | 7 | | | 8 | | | 9 | | | 10 | | | 11 | | | 12 | | | 13 | | | 14 | | | 15 | | | | | | | | | |---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---| CALL TO STA (ALL PRE-OPS COMPLETE) ** [[note]]PUMPS OSS EXPTS C&DH SUN SENSOR[[/note]] MCDS ON ORBIT TEST (SEQ 19) STATUS CKS PALLET/FLT PUMP POWER DN (SEQ 18) ORBITER POWER-UP (V9001. VOL 1) CARGO PRE-PWR SW LIST (SEQ 21) MS COMM PWR-DN (SEQ 28) CARGO COOLING CONFIG (SEQ 17) HYD CIRC PUMPS OFF CLEAR CONTROL AREA RECONFIGURE TO G9 COMM ACTIVATION (SEQ 26) MS1 CCTV PWR-UP (SEQ 27) MS1 LAUNCH CONFIGURATION TEST (SEQ 24) Cargo CTA [[Arrow pointing to]] DUAL [[Strikethrough]] LDB [[/strikethrough]] OPS MODE CONFIG (V9001, VOL 2) LPS P/L DC PWR - OFF CARGO S/W INITIALIZE (SEQ 07) LPS PALLET PWR-UP (SEQ 08) MS1 CARGO POST OPS CLEAR CONTROL AREA HYD CIRC PUMPS ON FLT PUMP PWR-UP (SEQ 09) LPS AFT FLT DECK CHECKOUT (SEQ 10)* IOWA PRE-SEP I/F/ TEST (SEQ 11)* RMS PWR-UP (V9001, VOL 3 LPS? P/L RCDR ACTVN P/L RCDR DUMP S-BANK F/M I/F CLEAR CONTROL AREA PDP/REM UNLATCH SEPARATION & CLOSEOUT (SEQ 12) HYDRASET OPERATION AFD UNLATCH PDP/REM MOTOR C/O PDP/REM SEP IOWA POST SEP I/F TEST (SEQ 12)* PDP/REM CLOSEOUT GND GUYS PFP/ REM MATE & RELATCH (SEQ 12)* IOWA POST RELATCH TEST (SEQ 13)* RMS PWR-DN (9001. VOL 3) OSS-1 PLUGS-OUT I/F TEST (SEQ 14) LPS/TAPE RCDRS CCTV PWR DN (SEQ 27) NO ORB P/L RCDR PLAYBACK (SEQ 23) TR1 & TR2 DUMP & CLOSEOUT (SEQ 15) SUS IM/SIA CALIBRATION (SEQ 16) EXP/C&DH PWR-OFF [[Right margin]] FREQ CLEARANCE S-BAND PM 2041.9 MH[[?]] 2106.4 2217.5 2287.5 S-BAND FN 2205.0 MH[[?]] UHF 296.8 MH[[?]] 169.5 174.1 171.92 180.3 [[/Right margin]] [[2nd section of table]] SUPPORT OTV RECORDING (PARA 1.4.3) OPF CRANE (SEQ 11/12) [[Right margin]]2-3-81[[/right margin]] VOICE RECORDING - RADIO NET 13 (SEQ 11/12) OPEN LOOP FREQ CLEARANCE RPS OIS RECORDING (PARA 1.4.2) [[3rd section of table]] SAFETY CONTROL 10 FT FROM AERO SURFACES & OMS ENGINES 25 FT. RADIUS AROUND PDP 5FT FROM S-BAND UL,UR,LL,LR,QUAD 2 FT. FROM UPPER & LOWER S-BAND HFMI'S & LOWER [[?]] [[/40 column table]] 12/11/81 "SIGNOFF" Review Van Hooser says MLR install ^n / 14-hr test inputs coming. Comm guys say they need some de-activ ^n for 50002 reconfig. [[backwards checkmark]] * Do wee need a freq clnc in 50002 for wireless comm? Passed to OX Dick Armstrong; Ox & Mike * Double-check Kelso is satisfied with only GSE VTR. To Page No.___ Witnessed & Understood by me,_____ Date_____ Invented by_____ Recorded by_____ Date_____
Transcription Notes:
40 column table print out insert taped in with overlapping inputs in all columns.
Due to the nature of this print-out and with instructions in mind for this transcription I see it impossible to follow accordingly with use of [[/x column table]] format and lack of superscript to correctly transcribe the visible image. The transcription I present has taken liberties while still attempting use of the [[/column table]] requirements just in a different format. All the information within the table is present in transcription. Smithsonian staff should format correctly/to their liking with this in mind upon an accepted review of this transcription.
----------
Reopened for Editing 2023-03-30 08:58:23