Viewing page 37 of 99

This transcription has been completed. Contact us with corrections.

34

Project No.__________
Book No._______ 
TITLE 1/6/82  
 
From Page No. _____

TPS work
   
along RRC on L upper way; R elenon cone area

RUD/SB PDU - showed some fluid accum @ delivery - baggie attached
More fluid in baggie @ inspection yesterday. Looking.

GOX pre-press valve - suspected generic O-ring problem now believed due teflon seal contamination (tho can't pin down contaminant source yet - suspect Gnd-side seal fragment)

Sample bottle analysis still in work - heat shield constraint

Cryo installation: problem torquing lock not/bushing sn O2 install
GSE. Will use H2 equipt.

V1061 preps in work. OMI flimsy due out today.
Rusted braqing machine holding up work.
(Ck vlvs being swapped w/ P orifice so engine purges possible)

IPR's seeped off

2V 1019 H20 supply xder (Flt anum 23)

1025 SRB bus A B/U pwr ON indication

1072 APU 1 GG chamber P readings

N/A FC 1 failure (Flt anum 8)

1037 PLT's RHC tsim switch

1075 H4O 3 RSB return live T readings

To Page No._____

Witnessed & Understood by me, ____________________
Date _________
Invented by ____________________
Recorded by ____________________
Date ____________

Transcription Notes:
---------- Reopened for Editing 2023-03-29 09:32:52 ---------- Reopened for Editing 2023-03-29 18:31:29 ---------- Reopened for Editing 2023-03-29 19:35:41