
This transcription has been completed. Contact us with corrections.
34 Project No.__________ Book No._______ TITLE 1/6/82 From Page No. _____ TPS work along RRC on L upper way; R elenon cone area RUD/SB PDU - showed some fluid accum @ delivery - baggie attached More fluid in baggie @ inspection yesterday. Looking. GOX pre-press valve - suspected generic O-ring problem now believed due teflon seal contamination (tho can't pin down contaminant source yet - suspect Gnd-side seal fragment) Sample bottle analysis still in work - heat shield constraint Cryo installation: problem torquing lock not/bushing sn O2 install GSE. Will use H2 equipt. V1061 preps in work. OMI flimsy due out today. Rusted braqing machine holding up work. (Ck vlvs being swapped w/ P orifice so engine purges possible) IPR's seeped off 2V 1019 H20 supply xder (Flt anum 23) 1025 SRB bus A B/U pwr ON indication 1072 APU 1 GG chamber P readings N/A FC 1 failure (Flt anum 8) 1037 PLT's RHC tsim switch 1075 H4O 3 RSB return live T readings To Page No._____ Witnessed & Understood by me, ____________________ Date _________ Invented by ____________________ Recorded by ____________________ Date ____________
Transcription Notes:
----------
Reopened for Editing 2023-03-29 09:32:52
----------
Reopened for Editing 2023-03-29 18:31:29
----------
Reopened for Editing 2023-03-29 19:35:41