![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
Project No. TITLE 3/15/82 Book No. 67 From Page No. PMD All elerons on; BF on. MPS P checking almost cplt APU plumbing installed; c/o IW with cryo sets No nav base - no IMU, AA ect testing. Done next month PBD saga getting a bit well - stbd door now open. KSC Ordnance installn starts today. S0007 preps Wed, count starts Thurs. DPS SPARES AT KSC as of 3/12/82 - Ed McKenzie GPC's CPU S/N 24 from FSL 10P S/N 22 - " - DU S/N 13 (CRT4) new out of Owego DEU S/N 20 used in KSC DPS lab "recently" Keybd S/N 11 in storage "a long time" MMU none S/N 10 installed 3/9/82 S/N 13 to be shipped form OV-099 MDM FF S/N 61 at KSC - 1 yr, unused FA S/N 43 never pwrd on since KSC arrival (when?) LA } none LF PL S/N 75 ? No bench-level maintenance (card swaps) at KSC MMU failure causes - motor-brush noise (bad seat on commutator - affects new LRU's) oxide particles; motor brush mat'l wear buildup tape slippage due capstan wear To Page No. [[6 Columned Table]] | Witnessed and Understood by me, | Date | Invented by | Recorded by | Date | | |---|---|---|---|---|---|