
This transcription has been completed. Contact us with corrections.
90 6/7 Project No._____ Book No._____ TITLE___________________________ From Page No.__ GPS 5 output to BACKUP : Steve will do this in post-Ingress Sw part 2 Issue to CPCB wed 6/9. DPS guys should Dev S0007 CRT mgmt/ launch issue still open. Perline writing 482 to do per S0017; Hw brofed J0, Crp, Trolly, will require S007 dev if passed. S0007 Devs to watch for: - If TAL chgs to DAK, TACAN T/W's will change - Mid PLB floods guarded? (Ellison) - Henry's LVLH @REF - 482 I/W. Judy Anderson says this sw not looked @by GLS) 6/10 DST telecon 1230 @ Don Brown's today. -Final tie-up after Omi inputs DST SIR (Sys. Integ. Review) 6/16 1/511 @1000 Fri 6/11 Telecon W/ Bill Johnson (JSC Integer). on Ops redr dump on lakebed. ops 1 4 2 ; RF to BUC. (x6353 , 45/3rd Fl. N side 1015) warren L. called : Pierson's Micro Smpl ICR is in sys. 6/11 Bill Johnson /Ops redr telecon Ops 1 & 2 rcds KSC- lackee , Herman , Mike Smth , Glasses RF to BUC From lakebed; HL BUC to elsewhere. S0026 Only. KSC Instrumentation will work dev; talk it @Tues telecon 2hrs total. Told em window is no earlier than L + L HR ( Latch Sh) Rationale: provide data early to MCC due their shed oa pulling out some console, used in analyzing the data (Bobby Pearce) CFES - GSE handholds (non-flt) requested by crew? Yes- They're still. on. Steve M'Cree' (Trng) working paper Handle to L of Fluid column is mandatory To Page No.____ Witnessed & Understood by me, __________________ Date _____________ Inveneted by _____________________ Recorded by ____________________ Date _____________
Transcription Notes:
----------
Reopened for Editing 2023-03-30 21:02:57