Viewing page 22 of 66

This transcription has been completed. Contact us with corrections.

out on float-washed
top - has small barnacles
on bottom. Puttied life
preserver holes. Cleaned
numbers - & also laced them.
Sat July 12
B W. Airs W -
Painted Decks & Rail
Life preserver put in eyes
to look toward life preserver
& painted sides & top of
upside of dingy tightened
up stuff [[?]]g box on drive
Painted white on port tip
p & [[?]] with w lead
oil & Turps with a little
whiting to thicken it.
Cap. White came in.
[[end page]]
[[start page]]
Sunday, July 13.
6-7 Rain bath. P.
Scrubbed cabin sides.
Painted inside of dingy
Then life dwg (doughnut)
Monday July 14
Fixed Toilet B6-
Put gas lau[[?]] on dingy
rewired it. Reds painted
closet. Success
Irish story came want
8 dwgs in 4 days. Worked
on it. Bought new
chain fm Chamberlain.
Tues July 15
B. W. Reds painted
[[?]] Robt. Came Talked
to Dixons who go to