Viewing page 16 of 203

This transcription has been completed. Contact us with corrections.

[[left-hand page]]
[[preprinted]] January,  Sunday, 24.  1897. [[/preprinted]]

Somewhat clear, moderate winds, cold -
Very very cold this evening - Wind 'howling'

[[end page]]

[[start page]]
[[preprinted]] January,  MONDAY, 25.  1897. [[/preprinted]]

Tempt -6[[degree symbol]] and Barometer 28.23 @ 7 AM
  " [[Ditto for: Tempt]]   + 2[[degree symbol]]  "   " [[Dittos for: and Barometer]]       28.13 @ 3 PM
  " [[Ditto for: Tempt]]  zero  "   " [[Dittos for: and Barometer]]        28.16 @ 5 [[superscript]] 3 [[/superscript]] /PM
  " [[Ditto for: Tempt]]   10[[degree symbol]] below zero at one time last night
Very very cold - Temps 2 below @ 6 pm

Both Collieries were delayed greatly on account of this extremely cold snap -  Coal frozen in breakers - machinery etc frozen fast -  Very difficult to get the empty cars down and get them loaded -  Did very poor hoistings -

Both Collieries worked 9 hours - Vulcan worked 5 - (Stopped so many times that, literally, we only worked 5 hours)
Both Collieries were short of water today - At Vulcan the steam presure was very low, and we had to stop now and again -

The new Jigs at Vulcan are working wonderfully well  We can dispense [[c in pen corrected to s with pencil]] with several slate pickers in those chutes -

The reservoirs at both Collieries were not full this morning, and we were greatly in need of water at both places - Neglect of someone in not having the reservoirs filled as we have been idle since last Wednesday - 