![Transcription Center logo](/themes/custom/tc_theme/assets/image/logo.png)
This transcription has been completed. Contact us with corrections.
[[preprinted]] October, TUESDAY, 5. 1897. [[/preprinted]] Tempt +54[[degree symbol]] and Barometer 28.65 @ 7 [[superscript]] Am [[/superscript]] [[ditto for: Tempt]] +56[[degree symbol]] [[ditto for: and Barometer]] 28.45 @ 6 pm Superb day - Both Collieries worked 10 hours Our allotment has been increased from 75 to 85 cars per day - At the present rate of hoisting we are unable to load 85 - Bmtn is doing very poor, about 35 per hour, while Vulcan is running up from 40 to 43 - Mr. DeCamp spent today with Mr. Jones Inside at BMtn this morning and on Vulcan breaker this Pm - Receiving car load of 6[[inch symbol]] pipe for [[number symbol]]3 Artesian Well at Vulcan Colliery - [[end page]] [[start page]] [[preprinted]] October, WEDNESDAY, 6. 1897. [[/preprinted]] Tempt +58[[degree symbol]] and Barometer 28.26 @ 7 [[superscript]] 3 [[/superscript]] /a [[ditto for: Tempt]] +62[[degree symbol]] [[ditto for: and Barometer]] 28.26 @ 6 pm Grey, this morning - Sun came out about 8:30 Am Pleasant all day Both Collieries worked 10 hours - The Lehigh Valley cut our allotment to-day - 85 cars per day and empties standing over from last Saturday is too much for us, as Buck Mountain is doing very poor - We are working hard at Buck Mountain to bring it up to its old standing - Trouble is that we have not enough miners - Only have about 86 parties while at Vulcan we have 126 - Artesian well at Vulcan, [[number symbol]]3, is now down 603 feet, green sand stone - We will test this holes capacity soon - We are exercising great care with Vulcan's preparation - Large sized [[strikethrough]] p [[/strikethrough]] mesh, plates have been placed after the Chestnut Jigs to take out the small chestnut, which runs the percentage of nut in Pea over [[superscript]] 5 [[/superscript]] /8[[inch symbol]] mesh considerably up - Mr. Griese, representing H W John's Mfg Co. called his PM - Are going to cover steam line at Vulcan, Boilers to Hoisting Engs with Asbestos Covering. [[end page]]