Viewing page 73 of 426

This transcription has been completed. Contact us with corrections.

Note: It has been proposed by several of the delegates since the conference that the planning study might include a demonstration exhibit. The cost of this is not included in the budget estimate. An additional $50,000 would be required for the exhibit. It was not included in the budget because it was not included in the conference report.